Garfield High School was unusable for several months of the year. (Before view)
Completed project (After view)
Before
After
Removal of old backstop
Finished backstop
Rough grading the site
Drainage trenches are dug, lined with perforated pipe and filled with gravel.
A protetive liner is laid down and decomposed granite is carefully placed on top.
The synthetic turf will be attached to a concrete curb that will also separate the sod from turf.
Fencing posts are installed for sideline fencing.
The pitcher's mound is set below the turf layer.
Finished field with fencing and dugouts
<
>